How to use the result

Change the inputs to compare a design scenario. The result is a starting point for discussion and does not replace a package escape study, a field solver, a qualified fabrication process or a supplier quotation.

Method and assumptions

Each checked item counts one prepared requirement out of ten. Items are equally weighted for convenience, but their engineering importance differs. A fully checked list does not mean the design passed DFM or complies with a standard. Selections are temporary and do not upload the design.

What to confirm next

  • The package pin map, actual land pattern and usable routing channels.
  • Exact copper, pressed dielectric, via spans and material system.
  • Electrical targets, assembly exposure and acceptance requirements.

Send an inquiry with your assumptions and the decisions still open.